|
LAVAN
OFFSHORE FIELDS :
|
|
Island
is located some 18 km south of Bandar Mogham in
Persian Gulf (Lat 26 47’ N-Long 53 20’ E)
Lavan
is the operating base for three offshore fields,
namely, Salman, Resalat and Reshadat and has
infrastructure facilities including process plants ,
storage and export system, utility and maintenance
facilities, storehouse and loading jetty for support
of offshore fields as well as the residential and
social areas. Local airport handles personnel
movements.
|
 |
|
Produced oil from offshore fields is transferred to
Lavan for final processing. Salman field 144 km
south of Lavan Island , has one of the largest
offshore complexes in the Persian Gulf.
|
|
Other
facilities at Lavan Island include Lavan
Distillation Company (LCD) where , under the
Refinery and Distribution group of NIOC, crude oil
is processed for by-products such as naphtha,
gasoline, kerosene , gas oil and fuel oil . Crude
oil is provided from NIOC – Offshore storage. Export
jetty at Lavan is also handling product carriers
beside the ocean going tankers.
|
|
Salman
onshore and offshore facilities which were damaged,
were all renovated and put on stream during the
first 5 – year plan, "Renovation programs for
Resalat and Reshadat is underway.
|
|
APPROACH/ANCHORAGE :
Vessels should approach from the south, which is
open and free of dangers. The approved anchorage
area is to the east of the oil loading dock at 53
22’ E. Pilot age is compulsory and harbor pilot
should be contacted on VHF channel 16 about six
hours before arrival at Lavan Island.
|
|
ACCOMMODATION :
Operating Company : National Iranian Oil Company –
Offshore Division
|
|
TWO
BERTH OIL LOADING JETTY :
There is a two berth double jetty available with an
overall length of 378 m.
The Outer Berth No. 1 with depth alongside 19-20 m,
is designed to handle Million Barrel/Aframax tankers
with arrival displacement not exceeding 120000 tons.
|
|
The
inner Berth No. 2 has the same overall length with a
maximum sailing drat of 11 m, for handling of
product tankers.
Each berth is provided with a Chiksan Loading Unit,
fitted with hydraulically operated loading arms.
Loading rates of max . 50000 bbls/hr for crude oil
and 600 tph for products such as fuel oil can be
achieved under favourable conditions.
|