On arrival at Kharg, all vessels
including those destined for SEA ISLAND, should proceed to
the approved anchorage area which is located to the east of
the eastern boundary of the harbor limits.
Ships must await instructions and not enter the harbor
limits unless a berthing master is on board.
|
|
OIL LOADING :
Both Iranian Light and
Heavy crude oil are available at all oil berths. Crude oil
is delivered to the terminals from the tank farm, elevated
62 m AMSL, situated on the central plateau of the Island ,
by gravity flow through pipelines. |
|
A-1)
TEN BERTH " TEE"
OIL LOADING JETTY :
The jetty is a "TEE" head which
has an overall length of 1840 m, connected to the shore 1100
m away by a piled trestle and rock filled causeway. The
jetty with depth alongside 17-21 m, is designed to handle
large tankers, three berths (No. 3,5 & 7) can accommodate
VLCC tankers of 300000 tons dwt, and Aframax tankers will
accommodate alongside the other berths. Deck level is 6.7 m
above chart datum. The berths from north to south are
numbered as follows :
Outer berths : 9,7,1,3,5
Inner berths : 10,8,2,4,6
Each berth is provided with a
Chiksan loading unit, fitted with hydraulically operated
loading arms. Loading rates of max : 15000 tph to one berth
can be achieved under favourable conditions.
|